Universal Access To All Knowledge
Home Donate | Store | Blog | FAQ | Jobs | Volunteer Positions | Contact | Bios | Forums | Projects | Terms, Privacy, & Copyright
Search: Advanced Search
Anonymous User (login or join us)
Upload
Search Results
Results: 1 through 2 of 2 (0.002 secs)
You searched for: mediatype:texts AND collection:PresidioTrustLibrary AND subject:"Wetlands Restoration"
[texts]Revised Draft Construction Documents for Corrective Action Implementation, Building 207/231 Area, Presidio of San Francisco, California, Volume 2 - MACTEC Engineering and Consulting
On behalf of the Presidio Trust, MACTEC Engineering and Consulting, Inc. prepared this Corrective Action Implementation Work Plan (Work Plan) to implement the corrective actions at five remedial units proposed in the Building 207/231 Area Final Corrective Action Plan, Building 207/231 Area, San Francisco, California (CAP). The Building 207/231 Area comprises approximately 8 acres of land in the northeast portion of the Presidio of San Francisco, located south of the Crissy Marsh...
Keywords: Environmental remediation; Building 207/231 Area; groundwater contamination; soil contamination; petroleum contamination; Crissy Marsh; Doyle Drive; Tennessee Hollow Riparian Corridor; Gorgas Avenue; wetlands restoration; freshwater restoration; historic preservation; technical specifications; obsolete
Downloads: 287
[texts]Revised Draft Corrective Action Implementation Work Plan Building 207/231 Area, Presidio of San Francisco, California Volume One - MACTEC Engineering and Consulting
On behalf of the Presidio Trust, MACTEC Engineering and Consulting, Inc. prepared this Corrective Action Implementation Work Plan to implement the corrective actions at five remedial units proposed in the Building 207/231 Area Final Corrective Action Plan, Building 207/231 Area, San Francisco, California. The Building 207/231 Area comprises approximately 8 acres of land in the northeast portion of the Presidio of San Francisco, located south of the Crissy Marsh...
Keywords: Environmental remediation; Building 207/231 Area; groundwater contamination; soil contamination; petroleum contamination; Crissy Marsh; Doyle Drive; Tennessee Hollow Riparian Corridor; historic preservation; Gorgas Avenue; wetlands restoration; freshwater restoration; obsolete
Downloads: 896 (1 review)
Advanced search

Group results by:

> Relevance
Mediatype
Collection

Related mediatypes

texts